Sponsored by isok.co Turn every shared article into measurable traffic isok.co gives teams clean short links, QR export and real-time channel analytics. Start tracking links
Sponsored by isok.co Share smarter links from your next campaign Create short URLs, watch source/device/geo trends and keep redirects fast. Try isok.co

Liuyang Red Tourism Highway Phase II Construction Commences, Expected to Open in September

yang Red Tourism Highway Phase II construction started, expected to open in September Changsha News Events Qingming Festival weather was generally sunny, the Yonghe section of theyang red tourism highway has completed the entire length of 8.51 kilometers of ground preparation task, and is now starting full-scale construction. It is reported that the last 1.1 kilometers of the first phase of the project is currently undergoing relocation, the second phase of the project is 22.1 kilometers long, and has now been launched in succession, and is expected to be fully completed by the end of September this year. (Changsha Evening News reporter Yan Ka Yun, correspondent Luo Fangping)

Sponsored by isok.co Make this article easy to share and measure Create a short isok.co link with QR export and click analytics before you share it. Create article link
Was this article helpful?

More articles you might like

Sponsored by isok.co Know which links actually work Use isok.co analytics to compare channels, QR scans and growth experiments. View short link analytics
Sponsored by isok.co Free to start, built for structured link intelligence Use isok.co for stable, low-latency redirects with anti-abuse controls and future branded domains. Open isok.co