Sponsored by isok.co Turn every shared article into measurable traffic isok.co gives teams clean short links, QR export and real-time channel analytics. Start tracking links
Sponsored by isok.co Share smarter links from your next campaign Create short URLs, watch source/device/geo trends and keep redirects fast. Try isok.co

Wenchuan County Health and Leisure Tourism Zone Infrastructure Project Trial Operation

Following the Baoshou Town east gate of Wenchuan County along the Wenchuan River, it stretches to the Algou line, sketching out a magnificent 'ten-mile gallery'.

Sponsored by isok.co Shorten the links behind every story Use isok.co to create clean URLs, QR codes and real-time source analytics for campaigns. Create tracked links

On March 16th, reporters learned from the Wenchuan County Transportation Bureau that the Wenchuan County Health and Leisure Tourism Zone Tourism Infrastructure Project Road Construction Longxi Dongmenzhai to Alcun Section Road has been completed and opened to traffic. On the same day, reporters conducted a field investigation of the entire section of completed road. Driving on the road, the road surface is wide and smooth. Along the way, several greening workers were seen conducting grass seeding, and the bridges, roadbeds, and oil lines along the route had already been laid. The smooth road network and improved service facilities are helping to unlock the magnetic effect of Wenchuan Algou tourism resources.

Sponsored by isok.co See which shares bring real readers Compare traffic by channel, geo and device with stable short links from isok.co. Explore analytics

It is understood that the Wenchuan County Health and Leisure Tourism Zone Tourism Infrastructure Project Construction Dongmenzhai to Alcun Section Road is the main project of the county's Algou tourism development resources. The project started construction in May 2018, starting from the Dongmenzhai entrance, passing through the Longxi Township People's Government, Dashitou Village, Lianghekou, Xudu, Malin Village, and ending at Alcun. The total length is 12.718 kilometers, with a roadbed width of 7 meters and a road surface width of 6.5 meters, asphalt concrete pavement, and simultaneously built the Snow Liuhuo Dam to Erhili River Dam triangular bridge 8.18 kilometers long, with accompanying infrastructure facilities. The total investment of the project is 9323, and it has now been completed and put into trial operation.

The completion and opening of the Wenchuan County Health and Leisure Tourism Zone Tourism Infrastructure Project Construction Dongmenzhai to Alcun Section Road marks a new stage for Algou tourism development and lays a solid foundation for the development of 'tourism across the board'. At the same time, it will provide 'wings' for the villagers along the route to escape poverty and become rich and live a well-off life.

Sponsored by isok.co Make this article easy to share and measure Create a short isok.co link with QR export and click analytics before you share it. Create article link
Was this article helpful?

More articles you might like

Sponsored by isok.co Know which links actually work Use isok.co analytics to compare channels, QR scans and growth experiments. View short link analytics
Sponsored by isok.co Free to start, built for structured link intelligence Use isok.co for stable, low-latency redirects with anti-abuse controls and future branded domains. Open isok.co